FirstCity
Welcome to First City University College Library iPortal | library@firstcity.edu.my | +603-7735 2088 (Ext. 519)
Amazon cover image
Image from Amazon.com

Software project cost and schedule estimating : best practices / William H. Roetzheim and Reyna A. Beasley.

By: Contributor(s): Material type: TextTextPublication details: Upper Saddle River, NJ : Prentice Hall, c1998.Description: xviii, 186 p. : ill. ; 23 cm. + 1 computer laser optical disc (4 3/4 in.)ISBN:
  • 0136820891
Other title:
  • Software project cost & schedule estimating [Cover title]
Subject(s): DDC classification:
  • 005.12 ROE 1998
Review: "This book presents powerful, scientific techniques for confidently producing - and defending - accurate software development estimates and schedules. Leading software costing experts William H. Roetzheim and Reyna A. Beasley walk through every form of estimating: high-level estimates for feasibility planning; function-oriented estimates for procurement; and implementation-oriented estimates based on detailed designs."--BOOK JACKET.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Home library Collection Shelving location Call number Status Date due Barcode Item holds
AV Circulation AV Circulation FIRST CITY UNIVERSITY COLLEGE FIRST CITY UNIVERSITY COLLEGE AV Circulation CD Cabinet1 005.12 ROE 1998 (Browse shelf(Opens below)) Available DD434
Open Collection Open Collection FIRST CITY UNIVERSITY COLLEGE FIRST CITY UNIVERSITY COLLEGE Open Collection FCUC Library 005.12 ROE 1998 (Browse shelf(Opens below)) Available 00009590
Total holds: 0

Accompanying CD-ROM held at Circulation Desk ; DD434.

Includes bibliographical references (p. 176-178) and index.

"This book presents powerful, scientific techniques for confidently producing - and defending - accurate software development estimates and schedules. Leading software costing experts William H. Roetzheim and Reyna A. Beasley walk through every form of estimating: high-level estimates for feasibility planning; function-oriented estimates for procurement; and implementation-oriented estimates based on detailed designs."--BOOK JACKET.